0
TelegramViberWhatsapp
Ukraine: +38 095 6563757
Poland: +48 22 390 63 48
E-Mail: info@prom-nasos.pro

Water section of the brew column F=25 m2

Code: 15656
(0 review)
ProducerBTS Engineering
Ukraine: Pre-order only
Poland: Pre-order only
Germany: Pre-order only
Italy: Pre-order only
$7 038 (netto)
Добавить в сравнение
We deliver anywhere in the world
The water section of the brew column is designed to condense water-alcohol vapors that come from the upper part of the column The principle of operation: the coolant and the cooling liquid are in the water section and do not mix, and the temperature transfer occurs through the walls of the channels through which they move. The main advantage of this device is that the working fluid moves along rectilinear pipes of large diameter. Such a structure increases the interval between stops of the device during maintenance and reduces the time spent on it.
Loading...
Products from the same category
Mash heater F=50 m2
15655
Producer
BTS Engineering
Pre-order only
0
$17 403
Foam trap ø1400
15657
Producer
BTS Engineering
Pre-order only
0
$3 740
Separator industrial ø700
15658
Producer
BTS Engineering
Pre-order only
0
$1 664
Capacitor F=5m2
15659
Producer
BTS Engineering
Pre-order only
0
$2 880
Brew column ø1200 30 plates
15660
Producer
BTS Engineering
Pre-order only
0
$36 425
Boiler BK F=30m2
15661
Producer
BTS Engineering
Pre-order only
0
$7 666
Decantator
15673
Producer
BTS Engineering
Pre-order only
0
$2 505
Observation lamp ø50X120
15674
Producer
BTS Engineering
Pre-order only
0
$2 021
Observation lamp ø32X100
15676
Producer
BTS Engineering
Pre-order only
0
$3 620
Separator
16531
Producer
BTS Engineering
Capacity, dal/day
200
Pre-order only
0
$3 706
Contact us